;//'); define('UC_CHARSET', 'utf-8'); define('UC_IP', 'UC_IP'); define('UC_APPID', 'UC_APPID'); define('UC_PPP', '20'); MeiMei正妹交友論壇 - Powered by Discuz! Board Board logo

標題: 60798 [打印本頁]

作者: Liulang123    時間: 2019-5-10 08:09     標題: 60798

"The relay device that failed was originally intended to provide a third layer of redundant protection for the Superdome's equipment," Rice said in a written statement provided to The Associated Press. "It was not necessary for the operation of either Entergy's or the Superdome's system. In other words,Yeezy Boost 350 Wholesale, taking the relay out of service does not affect how power is provided to the Superdome."
Indeed, before the device had been installed, the Superdome had hosted seven full Saints seasons since its post-Katrina renovation, as well as two college football BCS championships, an NCAA Final Four, and many other events 鈥?all without any problems. Thornton also noted that the Superdome was drawing less power for the Super Bowl than a typical early season Saints game because the air conditioning demands were far lower.




歡迎光臨 MeiMei正妹交友論壇 (http://tt42.infowww.meimei888.com/discuz/) Powered by Discuz! 7.0.0